{"id":312,"date":"2015-10-23T15:01:15","date_gmt":"2015-10-23T19:01:15","guid":{"rendered":"http:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/?page_id=312"},"modified":"2015-10-23T19:09:54","modified_gmt":"2015-10-23T23:09:54","slug":"issues-list","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/issues-list\/","title":{"rendered":"Issues List"},"content":{"rendered":"\n<table id=\"tablepress-12\" class=\"tablepress tablepress-id-12\">\n<thead>\n<tr class=\"row-1\">\n\t<th class=\"column-1\">Issue Number<\/th><th class=\"column-2\">Date Discovered<\/th><th class=\"column-3\">Status<\/th><th class=\"column-4\">Change Made By<\/th><th class=\"column-5\">Origin<\/th><th class=\"column-6\">Description<\/th><th class=\"column-7\">Resolution<\/th><th class=\"column-8\">Artifacts Changed<\/th>\n<\/tr>\n<\/thead>\n<tbody class=\"row-striping\">\n<tr class=\"row-2\">\n\t<td class=\"column-1\">1<\/td><td class=\"column-2\">10\/2\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Shivam<\/td><td class=\"column-5\">Slow progress in project work<\/td><td class=\"column-6\">Creating a proper structure for team management<\/td><td class=\"column-7\">Decided upon a project manager and risk manager<\/td><td class=\"column-8\">Responsibilities- <br \/>\nShivam: Project Manager<br \/>\nDorothy: Scrum Master and Risk Manager<br \/>\nRedefined scope on 2-18-16 to include extended simulation and planning<br \/>\n31-3-2016  Progress Reviewed and work redistributed<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">2<\/td><td class=\"column-2\">10\/2\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">All<\/td><td class=\"column-5\">PCB Task 5<\/td><td class=\"column-6\">Improper delegation of tasks leading to last minute workload<\/td><td class=\"column-7\">System of periodic checks and follow ups<\/td><td class=\"column-8\">PCB Task - Shivam and Richa<br \/>\nWebsite: Dorothy<br \/>\nMechanical Frame: Mohak and Pranav<br \/>\n<br \/>\nRedistribution of Tasks<br \/>\nClarity with respect to responsibilities<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">3<\/td><td class=\"column-2\">10\/3\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">All<\/td><td class=\"column-5\">PCB Task 5<\/td><td class=\"column-6\">Failure to balance prior experience and learning for project assignments<\/td><td class=\"column-7\">Task distribution with more weightage on strengths<\/td><td class=\"column-8\"><\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">4<\/td><td class=\"column-2\">9\/28\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Dorothy<\/td><td class=\"column-5\">Issues with Mohak's laptop<\/td><td class=\"column-6\">Android Studio and Qt not working on Mohak's laptop<\/td><td class=\"column-7\">Using Dorothy's laptop for Android Studio and Qt is no longer needed<\/td><td class=\"column-8\"><\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">5<\/td><td class=\"column-2\">10\/4\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\"><\/td><td class=\"column-5\">Priority given to other essential tasks for Sensors and Motors lab<\/td><td class=\"column-6\">Qt graphs did not work for Sensors and Motors Task<\/td><td class=\"column-7\">No longer using Qt<\/td><td class=\"column-8\"><\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">6<\/td><td class=\"column-2\">10\/21\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Mohak<\/td><td class=\"column-5\"><\/td><td class=\"column-6\">Creating a bash script for Bluetooth interfacing<\/td><td class=\"column-7\">Developed on ROS node instead<\/td><td class=\"column-8\"><\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">7<\/td><td class=\"column-2\">10\/2\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Pranav, Mohak, Shivam<\/td><td class=\"column-5\">Shivam, Mohak, and Dorothy discontinued Machine shop training due to increased workload<\/td><td class=\"column-6\">Only one team member attending Machine shop training<\/td><td class=\"column-7\">Mohak has access to carpentry tools, which are the only ones needed for our project.<\/td><td class=\"column-8\"><\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">8<\/td><td class=\"column-2\">11\/15\/2015<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Mohak, Shivam<\/td><td class=\"column-5\">Mobile platform interface with SBC<\/td><td class=\"column-6\">SBC is 32-bit and Oculus Prime packages require a 64-bit system administrator<\/td><td class=\"column-7\">Replicated exact electronics as in the full kit version<\/td><td class=\"column-8\">OculusPrime server is running on the Intel motherboard<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">9<\/td><td class=\"column-2\">2\/12\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Shivam<\/td><td class=\"column-5\">Full kit version of platform<\/td><td class=\"column-6\">Hardware and software defects in the platform. Platform doesn't dock and mapping does not initiate.<\/td><td class=\"column-7\">Docking issue resolved. Doing mapping alternatively using depth camera.<\/td><td class=\"column-8\">Docking issue closed. Manufacturer asked for replacement for both dock and depth camera.<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">10<\/td><td class=\"column-2\">3\/26\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Pranav<\/td><td class=\"column-5\">USB Port conflicts<\/td><td class=\"column-6\">XBee gets detected as MALG PCB and disrupts operation<\/td><td class=\"column-7\">Setup a routine to mitigate this behavior<\/td><td class=\"column-8\">Procedural Checklists made<br \/>\nSpecific instructions related to plugging in USB ports highlighted<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">11<\/td><td class=\"column-2\">3\/29\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Shivam<\/td><td class=\"column-5\">Old Platform<\/td><td class=\"column-6\">Unable to log in to tele-op the platform<\/td><td class=\"column-7\">Contact Xaxxon<\/td><td class=\"column-8\">Platform refurbished and tested<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">12<\/td><td class=\"column-2\">3\/20\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Shivam<\/td><td class=\"column-5\">Navigation of the platform<\/td><td class=\"column-6\">Platform fails to find valid controls in the constrained parking lot<\/td><td class=\"column-7\">Altered Parking Lot construction to ease restrictions on controls<\/td><td class=\"column-8\">Navigation Tested with updated new map<br \/>\nPhantom obstacles added to prevent platform navigating through spots<\/td>\n<\/tr>\n<tr class=\"row-14\">\n\t<td class=\"column-1\">13<\/td><td class=\"column-2\">4\/7\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Mohak<\/td><td class=\"column-5\">Lattice Planner paths for simulation<\/td><td class=\"column-6\">Incomplete nature of search due to motion primitives<\/td><td class=\"column-7\">Change Motion Primitives<\/td><td class=\"column-8\">Motion Primitives Changed<br \/>\nPaths returned verified for different start\/goal pairs<\/td>\n<\/tr>\n<tr class=\"row-15\">\n\t<td class=\"column-1\">14<\/td><td class=\"column-2\">4\/7\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Shivam<\/td><td class=\"column-5\">Global Planner for simulation<\/td><td class=\"column-6\">Multiple Goal Initialization using SBPl<\/td><td class=\"column-7\">SBPL crashes for multiple goal initializations<\/td><td class=\"column-8\">Dynamic memory allocation for planner and environment<\/td>\n<\/tr>\n<tr class=\"row-16\">\n\t<td class=\"column-1\">15<\/td><td class=\"column-2\">4\/15\/2016<\/td><td class=\"column-3\">Closed<\/td><td class=\"column-4\">Pranav,Shivam, Mohak<\/td><td class=\"column-5\">Simulation System Integration<\/td><td class=\"column-6\">Simulator crashes due to corner-cases in messages from ROS nodes<\/td><td class=\"column-7\">Test For Corner Cases<\/td><td class=\"column-8\">Corner-Cases tested and code corrected<br \/>\nTested simulation for prolonged periods for different initializations<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-12 from cache -->\n","protected":false},"excerpt":{"rendered":"","protected":false},"author":12,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"template_parts\/page-fullwidth_template.php","meta":{"footnotes":""},"class_list":["post-312","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/pages\/312","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/users\/12"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/comments?post=312"}],"version-history":[{"count":2,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/pages\/312\/revisions"}],"predecessor-version":[{"id":318,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/pages\/312\/revisions\/318"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2015teami\/wp-json\/wp\/v2\/media?parent=312"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}