{"id":118,"date":"2016-10-18T14:58:27","date_gmt":"2016-10-18T14:58:27","guid":{"rendered":"http:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/?page_id=118"},"modified":"2016-12-16T23:32:26","modified_gmt":"2016-12-16T23:32:26","slug":"schedule","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/schedule\/","title":{"rendered":"Schedule"},"content":{"rendered":"<p>Gantt Chart(Click to view full size image)<\/p>\n<p><a href=\"http:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-content\/uploads\/sites\/13\/2016\/10\/gant.png\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-122 size-large\" src=\"http:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-content\/uploads\/sites\/13\/2016\/10\/gant-1024x77.png\" alt=\"Gantt Chart\" width=\"474\" height=\"36\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-content\/uploads\/sites\/13\/2016\/10\/gant-1024x77.png 1024w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-content\/uploads\/sites\/13\/2016\/10\/gant-300x23.png 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-content\/uploads\/sites\/13\/2016\/10\/gant-768x58.png 768w\" sizes=\"auto, (max-width: 474px) 100vw, 474px\" \/><\/a><\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>The table below shows mile stones for the various progress reviews.<\/p>\n\n<table id=\"tablepress-11\" class=\"tablepress tablepress-id-11\">\n<tbody class=\"row-striping row-hover\">\n<tr class=\"row-1\">\n\t<td class=\"column-1\">Date<\/td><td class=\"column-2\">Milestone<\/td><td class=\"column-3\">Tasks to be Completed<\/td>\n<\/tr>\n<tr class=\"row-2\">\n\t<td class=\"column-1\">10\/20\/16<\/td><td class=\"column-2\">Progress Review 1<\/td><td class=\"column-3\">- Radio controlled flight<br \/>\n- Configure and calibrate existing sensors<\/td>\n<\/tr>\n<tr class=\"row-3\">\n\t<td class=\"column-1\">10\/27\/16<\/td><td class=\"column-2\">Progress Review 2<\/td><td class=\"column-3\">- CAD and fabricate sensor mounts<br \/>\n- Electrical power system design<br \/>\n- Select and purchase imaging sensors<\/td>\n<\/tr>\n<tr class=\"row-4\">\n\t<td class=\"column-1\">11\/10\/16<\/td><td class=\"column-2\">Progress Review 3<\/td><td class=\"column-3\">- CAD full system<br \/>\n- Hardware should be installed and mounted on the platform<br \/>\n- Should be able to collect data from mounted platform<\/td>\n<\/tr>\n<tr class=\"row-5\">\n\t<td class=\"column-1\">11\/22\/16<\/td><td class=\"column-2\">Progress Review 4<\/td><td class=\"column-3\">- Demonstrate ability to map point cloud and localize<\/td>\n<\/tr>\n<tr class=\"row-6\">\n\t<td class=\"column-1\">12\/01\/16<\/td><td class=\"column-2\">Progress Review 5<\/td><td class=\"column-3\">- Continue to improve odometry methods<\/td>\n<\/tr>\n<tr class=\"row-7\">\n\t<td class=\"column-1\">12\/08\/16<\/td><td class=\"column-2\">Progress Review 6<\/td><td class=\"column-3\">- Continue to improve odometry methods<br \/>\n- Demonstrate ability to map and localize and measure performance for validation experiments<\/td>\n<\/tr>\n<tr class=\"row-8\">\n\t<td class=\"column-1\">1\/21\/17<\/td><td class=\"column-2\">Progress Review 7<\/td><td class=\"column-3\">- Hardware refresh complete, cabling updated<br \/>\n- Interface setup between flight controller, ROS<\/td>\n<\/tr>\n<tr class=\"row-9\">\n\t<td class=\"column-1\">2\/7\/17<\/td><td class=\"column-2\">Progress Review 8<\/td><td class=\"column-3\">- FARO scan of LaFarge complete<br \/>\n- IMU integrated into localization algorithm<br \/>\n- Map type switch to occupancy grid<\/td>\n<\/tr>\n<tr class=\"row-10\">\n\t<td class=\"column-1\">2\/28\/17<\/td><td class=\"column-2\">Progress Review 9<\/td><td class=\"column-3\">- Point cloud to mesh generation functional<br \/>\n- Point cloud colored with RGB data<\/td>\n<\/tr>\n<tr class=\"row-11\">\n\t<td class=\"column-1\">3\/12\/17<\/td><td class=\"column-2\">Progress Review 10<\/td><td class=\"column-3\">- Wireless (RF, GPS) communications and sensing debugged<br \/>\n- Map mesh textured with RGB data<br \/>\n- Obstacle detection functional<\/td>\n<\/tr>\n<tr class=\"row-12\">\n\t<td class=\"column-1\">3\/21\/17<\/td><td class=\"column-2\">Progress Review 11<\/td><td class=\"column-3\">- Waypoint navigation functional<\/td>\n<\/tr>\n<tr class=\"row-13\">\n\t<td class=\"column-1\">4\/1\/17<\/td><td class=\"column-2\">Progress Review 12<\/td><td class=\"column-3\">- Full waypoint navigation functional<br \/>\n- Mapping, localization, planning stack integrated with vehicle<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<!-- #tablepress-11 from cache -->\n<p>Modified Dec 17 2016<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gantt Chart(Click to view full size image) &nbsp; &nbsp; The table below shows mile stones for the various progress reviews. Modified Dec 17 2016<\/p>\n","protected":false},"author":64,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-118","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/pages\/118","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/users\/64"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/comments?post=118"}],"version-history":[{"count":4,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/pages\/118\/revisions"}],"predecessor-version":[{"id":329,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/pages\/118\/revisions\/329"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamb\/wp-json\/wp\/v2\/media?parent=118"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}