{"id":285,"date":"2016-10-21T22:46:28","date_gmt":"2016-10-21T22:46:28","guid":{"rendered":"http:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/?page_id=285"},"modified":"2016-11-18T23:34:22","modified_gmt":"2016-11-18T23:34:22","slug":"task-breakdown","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/task-breakdown\/","title":{"rendered":"Work Breakdown"},"content":{"rendered":"<p class=\"c21 c35\"><span class=\"c9\">This section lays out the tasks planned for each of our functional subsystems and project management.<\/span><\/p>\n<h3 class=\"c21 c43\"><\/h3>\n<h3 class=\"c21 c43\"><span class=\"c30\">High-level Work Breakdown<\/span><\/h3>\n<p>&nbsp;<\/p>\n<h3 class=\"c21 c43\"><img loading=\"lazy\" decoding=\"async\" class=\"aligncenter wp-image-397\" src=\"http:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-300x105.jpg\" alt=\"high-level-wbs\" width=\"900\" height=\"316\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-300x105.jpg 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-768x270.jpg 768w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-1024x359.jpg 1024w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-700x246.jpg 700w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-520x183.jpg 520w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-360x126.jpg 360w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-250x88.jpg 250w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/High-level-WBS-100x35.jpg 100w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/h3>\n<h3 class=\"c21 c43\"><\/h3>\n<h3 class=\"c21 c43\">\u00a0<span class=\"c30\">Detailed Work Breakdown<\/span><\/h3>\n<h3 class=\"c21 c43\"><\/h3>\n<p>&nbsp;<\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-401 aligncenter\" src=\"http:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-1024x532.jpg\" alt=\"detailed-wbs\" width=\"900\" height=\"468\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-1024x532.jpg 1024w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-300x156.jpg 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-768x399.jpg 768w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-700x364.jpg 700w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-520x270.jpg 520w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-360x187.jpg 360w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-250x130.jpg 250w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS-100x52.jpg 100w, https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-content\/uploads\/sites\/17\/2016\/10\/Detailed-WBS.jpg 1876w\" sizes=\"auto, (max-width: 900px) 100vw, 900px\" \/><\/p>\n<h3 class=\"c21 c43\"><\/h3>\n<h3 class=\"c21 c43\"><span class=\"c30\">Project Planning, Continuity and Delivery tasks<\/span><\/h3>\n<p><span class=\"c9\">Initial Planning<\/span><\/p>\n<ul class=\"c4 lst-kix_1dzorlluf3em-1 start\">\n<li class=\"c12\"><span class=\"c9\">Define scope of the project and the requirements. <\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Conduct trade studies for parts and approaches.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Finalize functional, performance and cyber-physical requirements.<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Project Continuity<\/span><\/p>\n<ul class=\"c4 lst-kix_1dzorlluf3em-1 start\">\n<li class=\"c12\"><span class=\"c9\">Develop and maintain project website.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Design Fall and Spring demo.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Procure parts.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Fall demo preparation.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Field Tests.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Spring demo preparation.<\/span><\/li>\n<\/ul>\n<p>Project Delivery<\/p>\n<ul class=\"c4 lst-kix_1dzorlluf3em-1 start\">\n<li class=\"c12\"><span class=\"c9\">Deliver Conceptual Design Review.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Deliver Preliminary Design Review.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Deliver Critical Design Review.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Fall Demo.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Spring Demo.<\/span><\/li>\n<\/ul>\n<h3 id=\"h.owqq3k42pvrx\" class=\"c21 c43\"><span class=\"c30\">Subsystem Tasks<\/span><\/h3>\n<p><span class=\"c9\">Autonomous Flight System<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Ramp-up on Hexcopter operability.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Demonstrate waypoint navigation in a controlled environment (as per FVR).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Demonstrate waypoint navigation in a larger environment \u00a0(as per SVR).<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Sensing<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Finalize type and model of sensors to be used by conducting trade studies.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Test\/Validate sensors independently to ensure they meet performance requirements.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software to extract and process data for 1 sensor and associate coarse location and time information with the data.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Build payload with all sensors.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Test\/Validate s<\/span><span class=\"c9\">ystem to generate highly accurate sensor data keyed by spatio-temporal information.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software to extract and process payload data.<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Localized Pattern Navigation<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Design strategy for localized navigation pattern.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software for planning localized navigation pattern with acceptable sensor coverage (as per FVR).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software for planning localized navigation pattern with high quality sensor coverage (as per SVR).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software for planning localized navigation pattern for rescue operation to drop packet accurately (as per SVR).<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Rescue assembly system<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Evaluate and finalize the design and actuators for rescue assembly mechanism.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Fabrication of mechanical structure and test functionality independently.<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Global waypoint generation<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Software to generate optimal navigation path based on simplified coordinate input in a constrained environment (as per FVR).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software to translate region information from a Global Map to specific GPS coordinates for a large environment (as per SVR).<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Signature detection and analysis<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Finalize set of signatures to be used for detection.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Collect data and evaluate techniques for signature detection.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Build a rudimentary signature detection module (as per FVR).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Software for integration of the module with data obtained from payload sensors.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Collect large amount of data to train more accurate models.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Build advanced signature detection module (as per SVR)<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Performance optimizations\/scaling to operate within acceptable time (as per SVR).<\/span><\/li>\n<\/ul>\n<p><span class=\"c9\">Integration Tasks<\/span><\/p>\n<ul class=\"c4 lst-kix_z2v30l1ve949-1 start\">\n<li class=\"c12\"><span class=\"c9\">Design and fabricate mountings for sensors (if required).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Test flight with preliminary sensors.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Implement data collection pipeline to transfer data from aerial subsystem to base station.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Test end-to-end system for <\/span><span class=\"c9 c23\">search only operation<\/span><span class=\"c9\">\u00a0(as per FVR).<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Payload sensor integration and calibration during flight.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Interface sensor payload with onboard processor.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Integrate rescue drop assembly with Hexcopter and onboard processor.<\/span><\/li>\n<li class=\"c12\"><span class=\"c9\">Test end-to-end system for <\/span><span class=\"c9 c23\">search and rescue operation<\/span><span class=\"c9\">\u00a0(as per SVR).<\/span><\/li>\n<\/ul>\n<h2 id=\"h.o0nmyfyypkrx\" class=\"c21 c43 c100\"><\/h2>\n<hr \/>\n","protected":false},"excerpt":{"rendered":"<p>This section lays out the tasks planned for each of our functional subsystems and project management. High-level Work Breakdown &nbsp; \u00a0Detailed Work [&hellip;]<\/p>\n","protected":false},"author":80,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"page-templates\/page_fullwidth.php","meta":{"footnotes":""},"class_list":["post-285","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/pages\/285","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/users\/80"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/comments?post=285"}],"version-history":[{"count":11,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/pages\/285\/revisions"}],"predecessor-version":[{"id":410,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/pages\/285\/revisions\/410"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2016teamf\/wp-json\/wp\/v2\/media?parent=285"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}