{"id":658,"date":"2018-05-11T20:12:33","date_gmt":"2018-05-11T20:12:33","guid":{"rendered":"http:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/?page_id=658"},"modified":"2018-05-11T23:57:21","modified_gmt":"2018-05-11T23:57:21","slug":"schedule-2","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/schedule-2\/","title":{"rendered":"Schedule and Test plan"},"content":{"rendered":"<p><span style=\"font-weight: 400\">Over the course of the semester, we had mixed success with adhering to our development schedule. \u00a0Many of the preliminary tests were done within a week of the intended deadline, but the FPV test and the stop functionality test were significantly delayed. \u00a0This was due to a delay in obtaining hardware to integrate and limited support for doing additional tests in the case of the FPV functionality and delays in generating an accurate model in simulation for the stop functionality. \u00a0Both timelines could have been improved with a better balance of resources.<\/span><\/p>\n<p><span style=\"font-weight: 400\">The following schedule describes the test plan and development timeline for each subsystem component of the FlySense project.<\/span><\/p>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignleft size-full wp-image-781 img-responsive\" src=\"http:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-content\/uploads\/sites\/24\/2018\/05\/sched1.png\" alt=\"\" width=\"1014\" height=\"522\" \/><\/p>\n<p>&nbsp;<\/p>\n<p><strong>PR Presentation Schedule<\/strong><\/p>\n<p>PR 7- Nick Crispie<\/p>\n<p>PR8 &#8211; Nihar Tadichetty<\/p>\n<p>PR9- Shivang Baveja<\/p>\n<p>PR10 &#8211;\u00a0Joao Fonseca<\/p>\n<p>PR11 &#8211;\u00a0Harikrishnan Suresh<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Over the course of the semester, we had mixed success with adhering to our development schedule. \u00a0Many of the preliminary tests were done within a week of the intended deadline, but the FPV test and the stop functionality test were significantly delayed. \u00a0This was due to a delay in obtaining hardware to integrate and limited &#8230; <a href=\"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/schedule-2\/\" class=\"more-link text-uppercase small\"><strong>Continue Reading<\/strong> <i class=\"fa fa-angle-double-right\" aria-hidden=\"true\"><\/i><\/a><\/p>\n","protected":false},"author":107,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-658","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/pages\/658","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/users\/107"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/comments?post=658"}],"version-history":[{"count":8,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/pages\/658\/revisions"}],"predecessor-version":[{"id":790,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/pages\/658\/revisions\/790"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2017teamc\/wp-json\/wp\/v2\/media?parent=658"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}