{"id":466,"date":"2019-11-08T22:26:03","date_gmt":"2019-11-08T22:26:03","guid":{"rendered":"http:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/?page_id=466"},"modified":"2019-12-13T17:19:01","modified_gmt":"2019-12-13T17:19:01","slug":"risks-log","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/project-management\/risks-log\/","title":{"rendered":"Risks Log"},"content":{"rendered":"<p>&nbsp;<\/p>\n<table>\n<tbody>\n<tr>\n<td><b>ID<\/b><\/td>\n<td><b>Risk<\/b><\/td>\n<td><b>Type<\/b><\/td>\n<td><b>Description<\/b><\/td>\n<td><b>Likelihood<\/b><\/td>\n<td><b>Consequence<\/b><\/td>\n<td><b>Risk Reduction Plan<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">1<\/span><\/td>\n<td><span style=\"font-weight: 400\">Electric System Failure<\/span><\/td>\n<td><span style=\"font-weight: 400\">Technical<\/span><\/td>\n<td><span style=\"font-weight: 400\">The battery or electric system fails due to incorrect operation.<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/p>\n<p>(-1)<\/td>\n<td><span style=\"font-weight: 400\">4<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Add reverse voltage and overvoltage protection.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u2022 Document and regulate operation.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">2<\/span><\/td>\n<td><span style=\"font-weight: 400\">Work Delay<\/span><\/td>\n<td><span style=\"font-weight: 400\">Schedule<\/span><\/td>\n<td><span style=\"font-weight: 400\">Heavy workload puts the team behind the schedule<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/td>\n<td><span style=\"font-weight: 400\">5<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Optimize the WBS to break down the workload into manageable pieces.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">3<\/span><\/td>\n<td><span style=\"font-weight: 400\">Run Out of Budget<\/span><\/td>\n<td><span style=\"font-weight: 400\">Financial<\/span><\/td>\n<td><span style=\"font-weight: 400\">Run out of funds purchasing parts and repairing robots.<\/span><\/td>\n<td><span style=\"font-weight: 400\">0<\/span><\/td>\n<td><span style=\"font-weight: 400\">5<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022\u00a0 Make purchasing decisions carefully after the trade study.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">4<\/span><\/td>\n<td><span style=\"font-weight: 400\">Latency for Real-time Operation<\/span><\/td>\n<td><span style=\"font-weight: 400\">Technical<\/span><\/td>\n<td><span style=\"font-weight: 400\">Communication latency between master computer and UGV fails real-time operation.<\/span><\/td>\n<td><span style=\"font-weight: 400\">4<\/span><\/p>\n<p><span style=\"font-weight: 400\">(+1)<\/span><\/td>\n<td><span style=\"font-weight: 400\">4<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Use a higher speed router as a wifi booster.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">5<\/span><\/td>\n<td><span style=\"font-weight: 400\">Poor Weather for Validation Tests<\/span><\/td>\n<td><span style=\"font-weight: 400\">Schedule<\/span><\/td>\n<td><span style=\"font-weight: 400\">Poor weather prevents\/delays the system from outdoor experiments.<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/td>\n<td><span style=\"font-weight: 400\">3<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Monitor upcoming weather.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u2022 Schedule tests beforehand.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<table>\n<tbody>\n<tr>\n<td><b>ID<\/b><\/td>\n<td><b>Risk<\/b><\/td>\n<td><b>Type<\/b><\/td>\n<td><b>Description<\/b><\/td>\n<td><b>Likelihood<\/b><\/td>\n<td><b>Consequence<\/b><\/td>\n<td><b>Risk Reduction Plan<\/b><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">6<\/span><\/td>\n<td><span style=\"font-weight: 400\">Even Temperature Distribution<\/span><\/td>\n<td><span style=\"font-weight: 400\">Technical<\/span><\/td>\n<td><span style=\"font-weight: 400\">The temperate difference in the test field is close to or smaller than sensor noise.<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/td>\n<td><span style=\"font-weight: 400\">4<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Use sensors with higher sensitivities based on previous experimental results.<\/span><\/p>\n<p><span style=\"font-weight: 400\">\u2022 Add heat sources to the test field to increase temperature variance.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">7<\/span><\/td>\n<td><span style=\"font-weight: 400\">Poor Localization Accuracy<\/span><\/td>\n<td><span style=\"font-weight: 400\">Technical<\/span><\/td>\n<td><span style=\"font-weight: 400\">Localization accuracy is not high enough considering the size of the test field.<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/td>\n<td><span style=\"font-weight: 400\">5<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Use RTK GPS instead of a built-in GPS.<\/span><\/td>\n<\/tr>\n<tr>\n<td><span style=\"font-weight: 400\">8<\/span><\/td>\n<td><span style=\"font-weight: 400\">Slow Temperature Convergence\u00a0<\/span><\/td>\n<td><span style=\"font-weight: 400\">Technical<\/span><\/td>\n<td><span style=\"font-weight: 400\">Temperature converges too slow for ground truth and onboard sensors to meet the time requirement.\u00a0<\/span><\/td>\n<td><span style=\"font-weight: 400\">1<\/span><\/p>\n<p><span style=\"font-weight: 400\">(-3)<\/span><\/td>\n<td><span style=\"font-weight: 400\">5<\/span><\/td>\n<td><span style=\"font-weight: 400\">\u2022 Use temperature sensors with the faster response time.<\/span><\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-468 size-full\" src=\"http:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06.png\" alt=\"\" width=\"1112\" height=\"503\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06.png 1112w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-300x136.png 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-768x347.png 768w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-1024x463.png 1024w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-700x317.png 700w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-520x235.png 520w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-360x163.png 360w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-250x113.png 250w, https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-content\/uploads\/sites\/37\/2019\/11\/Screenshot-from-2019-11-08-17-27-06-100x45.png 100w\" sizes=\"auto, (max-width: 1112px) 100vw, 1112px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>&nbsp; ID Risk Type Description Likelihood Consequence Risk Reduction Plan 1 Electric System Failure Technical The battery or electric system fails due to incorrect operation. 1 (-1) 4 \u2022 Add reverse voltage and overvoltage protection. \u2022 Document and regulate operation. [&hellip;]<\/p>\n","protected":false},"author":163,"featured_media":0,"parent":180,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-466","page","type-page","status-publish","hentry","clearfix"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/pages\/466","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/users\/163"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/comments?post=466"}],"version-history":[{"count":5,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/pages\/466\/revisions"}],"predecessor-version":[{"id":519,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/pages\/466\/revisions\/519"}],"up":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/pages\/180"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2018teamg\/wp-json\/wp\/v2\/media?parent=466"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}