{"id":728,"date":"2020-12-18T19:12:38","date_gmt":"2020-12-18T19:12:38","guid":{"rendered":"http:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/?page_id=728"},"modified":"2020-12-18T19:13:16","modified_gmt":"2020-12-18T19:13:16","slug":"wbs","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wbs\/","title":{"rendered":"WBS"},"content":{"rendered":"<h1>Work Breakdown Structure<\/h1>\n<p>The Work Breakdown Structure seen in Figure below shows the division of the Pit Navigator<br \/>\nproject into its various subsystems.<\/p>\n<p>Our project was divided into 3 broad components. Hardware tasks are mentioned in section 1.1.\u00a0 Software is shown in section 1.2. The\u00a0higher-level software tasks are represented within the WBS by sections 1.2.2 Brinkmanship and 1.2.3 Planning.<\/p>\n<p>The final high-level heading, 1.3 Management, covers all the project management aspects of<br \/>\nthis project. Project management is a task that has been actively maintained throughout the duration of the project. Purchases were tracked with a regularly updated budget, progress was measured against a clearly defined schedule, and risks were tracked and mitigated wherever possible.<\/p>\n<div id=\"attachment_729\" style=\"width: 1448px\" class=\"wp-caption aligncenter\"><img loading=\"lazy\" decoding=\"async\" aria-describedby=\"caption-attachment-729\" class=\"wp-image-729 size-full\" src=\"http:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-content\/uploads\/sites\/46\/2020\/12\/Screenshot-2020-12-18-at-1.57.33-PM.png\" alt=\"\" width=\"1438\" height=\"489\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-content\/uploads\/sites\/46\/2020\/12\/Screenshot-2020-12-18-at-1.57.33-PM.png 1438w, https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-content\/uploads\/sites\/46\/2020\/12\/Screenshot-2020-12-18-at-1.57.33-PM-300x102.png 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-content\/uploads\/sites\/46\/2020\/12\/Screenshot-2020-12-18-at-1.57.33-PM-1024x348.png 1024w, https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-content\/uploads\/sites\/46\/2020\/12\/Screenshot-2020-12-18-at-1.57.33-PM-768x261.png 768w\" sizes=\"auto, (max-width: 1438px) 100vw, 1438px\" \/><p id=\"caption-attachment-729\" class=\"wp-caption-text\">Work Breakdown Structure<\/p><\/div>\n","protected":false},"excerpt":{"rendered":"<p>Work Breakdown Structure The Work Breakdown Structure seen in Figure below shows the division of the Pit Navigator project into its various subsystems. Our project was divided into 3 broad components. Hardware tasks are mentioned in section 1.1.\u00a0 Software is shown in section 1.2. The\u00a0higher-level software tasks are represented within the WBS by sections 1.2.2<br \/><a class=\"moretag\" href=\"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wbs\/\">+ Read More<\/a><\/p>\n","protected":false},"author":211,"featured_media":0,"parent":0,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-728","page","type-page","status-publish","hentry"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/pages\/728","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/users\/211"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/comments?post=728"}],"version-history":[{"count":2,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/pages\/728\/revisions"}],"predecessor-version":[{"id":731,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/pages\/728\/revisions\/731"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2020teamg\/wp-json\/wp\/v2\/media?parent=728"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}