Component Testing & Experiment Results

Spring Semester

Full-System Testing

For the full system testing, we aimed to achieve

  • Reach goal within drift <= 5m
  • Avoid curb of height ≥ 5cm
  • Avoid static humans and obstacles
  • Complete a 250m route within 5 min
  • Number of E-STOP safety interventions <= 2

Test route

Test time: Apr 24, 2025 8am

Result

Time spentNumber of E-STOPDistance to goalNumber of collisions
8min1< 2m0