{"id":138,"date":"2024-11-25T16:20:01","date_gmt":"2024-11-25T16:20:01","guid":{"rendered":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/?page_id=138"},"modified":"2025-10-04T04:05:51","modified_gmt":"2025-10-04T04:05:51","slug":"schedule","status":"publish","type":"page","link":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/project-management\/schedule\/","title":{"rendered":"Schedule"},"content":{"rendered":"\n<h2 class=\"wp-block-heading\">Spring Progress Review Presenter Order<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>ILR 1 &#8211; Keerthi GV<\/li>\n\n\n\n<li>PR1 &#8211; Kshitij Bhat<\/li>\n\n\n\n<li>PR2 &#8211; Rohit Satishkumar<\/li>\n\n\n\n<li>PR3 &#8211; Abhishek Mathur<\/li>\n\n\n\n<li>PR4 &#8211; Tom Gao<\/li>\n<\/ol>\n\n\n\n<h2 class=\"wp-block-heading\">Fall Progress Review Presenter Order<\/h2>\n\n\n\n<ol class=\"wp-block-list\">\n<li>PR7 &#8211; Keerthi GV<\/li>\n\n\n\n<li>PR8 &#8211; Rohit Satishkumar<\/li>\n\n\n\n<li>PR9 &#8211; Kshitij Bhat<\/li>\n\n\n\n<li>PR10 &#8211; Abhishek Mathur<\/li>\n\n\n\n<li>PR11 &#8211; Tom Gao<\/li>\n<\/ol>\n\n\n\n<h3 class=\"wp-block-heading\">Spring Gantt Chart (Updated Mar 2025)<\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"839\" src=\"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-1024x839.jpg\" alt=\"\" class=\"wp-image-225\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-1024x839.jpg 1024w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-300x246.jpg 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-768x629.jpg 768w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-1000x819.jpg 1000w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-230x188.jpg 230w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-350x287.jpg 350w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3-480x393.jpg 480w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/04\/gantt_apr3.jpg 1039w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<p>The above shows our Gantt Chart for the Spring semester, re-estimated after the PDR presentation. The components that required the most effort were 1) Perception and 2) Simulation. A sizable amount of work, including the entire Navigation subsystem, was made trivial after we adapted the xarm_ros github repository.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\">Fall Gantt Chart (Updated October 2025)<\/h3>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"972\" height=\"713\" src=\"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image.png\" alt=\"\" class=\"wp-image-368\" srcset=\"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image.png 972w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-300x220.png 300w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-768x563.png 768w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-700x513.png 700w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-520x381.png 520w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-360x264.png 360w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-250x183.png 250w, https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-content\/uploads\/sites\/87\/2025\/10\/image-100x73.png 100w\" sizes=\"auto, (max-width: 972px) 100vw, 972px\" \/><\/figure>\n\n\n\n<p>The above shows our Gantt Chart for the Fall semester. Mainly the focus will be to set up the system on the Warthog, enable perception for varied lighting conditions, make dual arm planning more synchronized and transfer testing and deployment to NSH High Bay Area<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Spring Progress Review Presenter Order Fall Progress Review Presenter Order Spring Gantt Chart (Updated Mar 2025) The above shows our Gantt Chart for the Spring semester, re-estimated after the PDR presentation. The components that required the most effort were 1) [&hellip;]<\/p>\n","protected":false},"author":407,"featured_media":0,"parent":19,"menu_order":0,"comment_status":"closed","ping_status":"closed","template":"","meta":{"footnotes":""},"class_list":["post-138","page","type-page","status-publish","hentry","clearfix"],"_links":{"self":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/pages\/138","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/pages"}],"about":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/types\/page"}],"author":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/users\/407"}],"replies":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/comments?post=138"}],"version-history":[{"count":9,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/pages\/138\/revisions"}],"predecessor-version":[{"id":372,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/pages\/138\/revisions\/372"}],"up":[{"embeddable":true,"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/pages\/19"}],"wp:attachment":[{"href":"https:\/\/mrsdprojects.ri.cmu.edu\/2025teame\/wp-json\/wp\/v2\/media?parent=138"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}