Our full spring test plan documentation is available here: Spring Test Plan
T01: Teleoperation Test
Date: 01/03/2025 (with Grader), 03/04/2025 (with Dozer)
Result: Satisfies verification criteria

T02: IMU Interfacing and Connectivity Test
Date: 02/08/2025
Result: Satisfies verification criteria. However, IMU after bias-correction is still noisy.

T03: Depth Camera Connectivity Test
Date: 01/16/2025 (with Laptop), 03/04/2025 (with Jetson)
Result: Satisfies verification criteria.

T04: Dozer Assembly Test
Date: 01/18/2025 (first iteration), 03/04/2025 (second iteration)
Result: Minor iterations and refinement in dozer placement.


T05: External Infrastructure Test
Date: 02/24/2025
Result: Satisfies verification criteria.

T06: Wheel Tests
Date: 01/30/2025 (first iteration), 03/04/2025 (second iteration)
Result: Satisfactory wheel slip and sinkage. Going ahead with design.


T07: Complete Hardware Test
Date: In Progress
Result: In Progress
T08: Mapping the Moon Yard
Date: 01/16/2025 (first test), 02/24/2025 (second test), 03/03/2025 (third test)
Result: Satisfies verification criteria. Minor adjustments in occupancy grid parameters to remove noise.


T09: Localization Test
Date: In Progress
Result: In Progress
T10: Optimal Mast Depth Camera Placement Test
Date: 03/04/2025
Result: Satisfies verification criteria. Optimal placement calculated to be {X, Y, Z, R, P, Y} = {0.5, 0, 0.6, 0, -30, 0} from rover’s center of mass.

T11: Autonomous Navigation Validation Test
Date: In Progress
Result: In Progress
T12: Tool Planner Test
Date: In Progress
Result: In Progress