Work Breakdown Structure

The Work Breakdown Structure seen in Figure below shows the division of the Pit Navigator
project into its various subsystems.

Our project was divided into 3 broad components. Hardware tasks are mentioned in section 1.1.  Software is shown in section 1.2. The higher-level software tasks are represented within the WBS by sections 1.2.2 Brinkmanship and 1.2.3 Planning.

The final high-level heading, 1.3 Management, covers all the project management aspects of
this project. Project management is a task that has been actively maintained throughout the duration of the project. Purchases were tracked with a regularly updated budget, progress was measured against a clearly defined schedule, and risks were tracked and mitigated wherever possible.

Work Breakdown Structure