Risk Management

Risk NumberRiskRequirementRisk TypeLikelihoodConsequenceMitigation
1Integration BottlenecksAllSchedule
Technical
34– Develop an integration schedule
– Develop a system to share resources
2Nitrate Sensor ReliabilityM.P.4-5, M.P.8Technical32– Test the nitrate sensor to determine characteristics
– Develop methods to filter readings
3Complex FSMAllTechnical33– Remove sub-states from design of FSM
4Gripper CenteringM.P.6-7Technical34– Undershoot grip rather than overshoot
– Develop visual servoing
5Design vs. BuildAllTechnical
Schedule
21– Develop prototypes quickly to understand failure cases
6Inaccurate Width EstimationM.P.3Technical23– Test the perception stack early to determine likelihood