Test Plan

See our full spring test plan HERE.

Setup

System Scorpion platform with sensor assemblies and user interface installed. The system is pre-initialized before the test begins.
Test Area In the grass field at the NREC campus, 10 targets are buried in a 5 x 5m area to a range of depths, up to a maximum of 10cm. The targets consist of 5 hollow steel tubes to represent landmines and 5 metallic non-cylindrical objects to represent debris. The cavity in the steel tubes is filled with putty before burial. The area is divided into 5 x 1m wide lanes with flags at the ends. The right-hand lane is free of any buried objects. The coordinates of the area to be covered are entered before the test begins.
SVE Demo Area The SVE Demo Area is a subset of the Test Area, which consists of a single 5 x 1m lane which contains 2 landmine targets and 2 non-landmine targets.

Procedure

1 Operator A presses the “Start Survey” button on the UI and pushes the cart along a predefined path of known length (D.N.1). At the same time, a test assistant measures the time taken for the cart to reach the end of the path and verifies that the rate of coverage exceeds 3m²/min (M.N.3).
2 The operator then enters the SVE Demo Area and pushes the cart. While pushing the cart, a target may be detected at any time. Operator A responds to the signals on the UI as appropriate.
3 When the survey is complete, Operator B presses the “Generate Report” button on the UI.
4 Using the report and data from tests performed prior to SVE, Operator B verifies that at least 4 of the 5 simulated landmines were correctly classified (M.F.1).
5 Using the report and data from tests performed prior to SVE, Operator B verifies that at least 3 of the 5 simulated debris objects were correctly classified (M.F.2).
6 Using the report, Operator B verifies that the time of classification for each detected object was no more than 5 minutes (M.N.4).
7 Using the report, Operator B verifies that the maximum distance between the pre-entered landmine locations and the locations of the objects identified as landmines is <100cm (D.F.1)
8 Using the report, Operator B verifies that the maximum distance between the pre-entered lane locations and the vehicle’s recorded path is <100cm (D.F.2).
9 Test assistant A measures the maximum distance between the true locations of the targets identified as landmines and the corresponding ground marking made during the survey and verifies it is <10cm (M.F.4).
10 Test assistants B and C remove the buried simulated landmines from the ground and verify that no impressions were made on the top surface (M.F.3).
11 Operator B shows a log of prior system operation and verifies that the difference between timestamps of an initial detection by the metal detector and brake activation is <0.25s (M.F.5).
12 Operator B presents a record of expenditure of <$5000 (M.N.1).
13 Operator B shows a log of prior system operation for a continuous period of >1hr (M.N.2).
14 Operator B presents a photo of the weighing of each individual component assembly, showing that each is <50kg (D.N.2).