Schedule
Progress Review (PR) order – Spring semester
PR 8, Feb 14 – Chris Song
PR 9, Feb 28 – Andrew Wong
PR 10, Mar 21 – Yanda Huang
PR 11, April 4 – Jen Isaza
PR 12, April 16 – Divya Kulkarni
SVE / SVE Encore, Mar 2– Entire team
Gantt Chart
Risk Table and Matrix
Test Plan
Test Plan Document
Fall Validation Experiment
- Cabot is placed in front of the door to NSH 4524 with a preset destination.
- Cabot starts navigation, leading the user holding the iPhone.
- Non-visual feedback will be given to user regarding directions.
- Cabot alerts user when destination is reached.
- User powers off Cabot.
Spring Validation Experiment
- Cabot is taken to NSH 4524 and user can select several destinations.
- User inputs destination through custom user interface on smartphone.
- Cabot navigates to the destination, leading the user. Cabot avoids local obstacles on different surfaces and updates user with regards to: directions (upcoming turns) and number of pedestrians ahead through verbal feedback.
- Cabot alerts user when destination is reached.
- User can select another destination.