The Hip Team

Skip to content
  • Home
  • Design
    • Use Case
    • System Requirements
    • Functional Architecture
    • Cyberphysical Architecture
    • Subsystem Description
  • Implementation
    • Mechanical Subsystem
    • Sensing Subsystem
    • Electrical Subsystem
    • Software and Processing Subsystem
    • Actuation Subsystem
  • Performance
  • Project Management
    • Parts List
    • Issues Log
    • Risk Updates
    • Spring Validation Experiments
    • Schedules
    • Budget
    • Test Plan
  • Media
  • Team
  • Documentation
    • Conceptual Design Review
    • Preliminary Design Review
    • Presentations, presenter lists & ILRs
    • CDR Presentation and Report
    • Electrical Subsystem/ PCB design
    • Software Documentation
    • Final Report

Schedules

Posted on February 22, 2019December 13, 2019 by rnilakan

Schedules for the Subsystem Development (Spring)

Mechanical Schedule

Electrical Schedule

Software Schedule

 

Work Breakdown Structure Updates (Fall)

 

Schedules for the Subsystem Development (Fall)

Mechanical Schedule

 

Electrical Schedule

 

 

Software Schedule

 

 

Updated Schedules for Fall

Updated Schedule for Fall Drive Link
This entry was posted in Project Management Tools. Bookmark the permalink.

Post navigation

← Conceptual Design Review
Spring Validation Experiments →

Archives

  • December 2019
  • November 2019
  • May 2019
  • April 2019
  • February 2019

Meta

  • Log in
Zerif Lite developed by ThemeIsle