Work Breakdown Structure
End of Fall 2022
Shown here is the final Work Breakdown Structure. Fortunately, we were able to complete all of the work packages that we had left from the Spring, and the ones we added at the beginning of the Fall semester.

Beginning of Fall 2022
As of the beginning of Fall 2022, here is the updated Work Breakdown Structure. The Planning package was removed because of changing requirements that no longer needed planning. A Watchdog package was added/further expanded upon once a discussion with our sponsors outlined the desired requirements for this package. Parts of the Hardware package were put back into In-Progress because of the reamer redesign, and an added ballistics gel sub-package was for a more realistic demonstration setup.

End of Spring 2022
As of the end of Spring 2022, here were the completed tasks in our Work Breakdown Structure:

Beginning of Spring 2022
This is the initial Work Breakdown Structure at the beginning of Spring 2022.