Issue No. | Subject | Description | Owner | Resolution | Date Discovered | Date Resolved | Status |
1 | Optics | Optics selected for full 16′ deck size, need to reevaluate for 4′ test deck size | Ryan | Re-sized | 10/22/2015 | 11/10/2015 | Done |
2 | Signal Hack | Signal conversion board is delayed. | Sam | Received | 10/28/2015 | 11/6/2015 | Done |
3 | Power Board | Switching Regulator voltage too low. | Ryan | Redesigned | 11/20/2015 | 2/20/2016 | Done |
4 | Deck | Sponsor Dynamic Deck Inoperable | Eitan | Replaced | 1/23/2016 | 3/20/2016 | Done |
5 | Localization | Interference from other light sources | Ryan | Redesigned | 12/20/2015 | 4/22/2016 | Done |
6 | Controls | Need to implement feed forward control to prevent overshoot | Sam & Shu-Kai | Implemented | 3/10/2016 | 4/11/2014 | Done |