Issue No. Subject Description Owner Resolution Date Discovered Date Resolved Status
1 Optics Optics selected for full 16′ deck size, need to reevaluate for 4′ test deck size Ryan  Re-sized 10/22/2015  11/10/2015 Done
2 Signal Hack Signal conversion board is delayed. Sam Received 10/28/2015 11/6/2015 Done
3 Power Board Switching Regulator voltage too low. Ryan Redesigned 11/20/2015 2/20/2016 Done
4 Deck Sponsor Dynamic Deck Inoperable Eitan Replaced 1/23/2016 3/20/2016 Done
5 Localization Interference from other light sources Ryan  Redesigned 12/20/2015 4/22/2016 Done
6 Controls Need to implement feed forward control to prevent overshoot  Sam &     Shu-Kai Implemented 3/10/2016 4/11/2014 Done