a. Design Brainstorming
Scope Analysis (September 3, 2015)
Requirements Analysis (September 9, 2015)
Concept Refinement (September 13, 2015)
Functional & Cyberphysical Architecture (September 18, 2015- Fall and January 2016- Spring)
Timeline Planning (September 29, 2015)
Fall Validation Experiment (September 30, 2015) &
b. Drawings, schematics, and datasheets
Maxbotix Ultrasonic Sensor LV EZ MB 1010 Datasheet – link
Sharp GP2Y0A02YK IR Datasheet – link
c. Component testing & experiment results
Results of experimental tests of Obstacle Detection and Vision System are added in the System Implementation section.
d. Presentations
Reports & In-Class Presentations:
Critical Design Review (Report)
Standards and Regulations Presentation
Individual Lab Reports:
Tushar Agrawal | Sean Bryan | Pratik Chatrath | Adam Yabroudi |
---|---|---|---|
ILR 1 ILR 2 ILR 3 ILR 4 ILR 5 ILR 6 ILR 7 ILR 8 ILR 9 ILR 10 ILR 11 | ILR 1 ILR 2 ILR 3 ILR 4 ILR 5 ILR 6 ILR 7 ILR 8 ILR 9 ILR 10 ILR 11 | ILR 1 ILR 2 ILR 3 ILR 4 ILR 5 ILR 6 ILR 7 ILR 8 ILR 9 ILR 10 ILR 11 | ILR 1 ILR 2 ILR 3 ILR 4 ILR 5 |